What sits behind older walls in Greater Victoria.
Character homes in Victoria and Oak Bay and mid-century bungalows across Saanich, Esquimalt, and Sidney often share these four. We look for them at the site walk.
- 01
Older wiring
Older panels and wiring are often sized for far less than a modern kitchen or bath needs.
- 02
Aging supply and drain lines
Original or patched plumbing is a common find. We check what we can see at fixtures, in the basement, and in crawl spaces.
- 03
Plaster-and-lath walls
Plaster and lath cut, patch, and finish differently than drywall.
- 04
Settled framing
Decades of settling leave floors out of level and openings out of square. New cabinets, doors, and floors have to allow for it.
Section 02
Modernizing systems while keeping character.
New systems behind the walls, finished to fit the house.
Electrical capacity and lighting
Red Seal electricians upgrade circuits and add lighting.
Plumbing
Red Seal plumbers replace old supply and drain lines in the renovated areas.
Insulation
Open walls and ceilings are a good time to add insulation.
Trim, casing, and floor transitions
Our crews fit and finish new work to meet the existing casing, baseboards, and floors.
Section 03
Pre-1990 testing and written change orders.
- 01
A hazardous materials assessment comes first.
Pre-1990 BC homes typically need a hazardous materials assessment by a qualified specialist before demolition. You arrange it, and we can point you to a specialist. We do not do this testing or any abatement, and our crews do not start demolition until the assessment is in place where it is required.
- 02
You approve hidden-condition work in writing.
If opening a wall shows something the site walk could not, we write up a change order with its price.
This is practical guidance, not legal advice.
Projects
Project guides for older homes
Can an older or character home be renovated in phases?
Yes. We can do the kitchen first and the bathrooms later, each with its own estimate.
We note which electrical or plumbing upgrades make sense now, so later phases connect to them.
How are electrical and plumbing upgraded in older walls?
Rough-ins go in while the walls are open. Then our crews close the walls and finish them to match the house.
What happens if you find surprises behind plaster, lath, or framing?
We stop and show you. Any extra work gets a written change order and starts only after you approve it.
A careful site walk finds many of these early.
What testing is needed before demolition in a pre-1990 home?
Pre-1990 BC homes typically need a hazardous materials assessment by a qualified specialist before demolition. You arrange it, and we can point you to a specialist.
We do not do testing or abatement. This is practical guidance, not legal advice.
One contract · One schedule · One accountable team