Permits · Greater Victoria
Permits and Red Seal trades in Greater Victoria.
Which renovations often need a permit, who does the permitted work, and when inspections happen.
- General contractor
- Based in North Saanich
- Greater Victoria
Section 01
What typically requires a permit and what usually does not.
An overview of common home projects. We confirm the details for your house.
Often needs a permit
- Structural wall changes, such as removing or opening a load-bearing wall
- New secondary suites and basement conversions
- Many raised or attached decks, depending on height and municipality
- Electrical panel upgrades and new circuits
- Plumbing rough-in, moved drains, repipes, and water heater changes
- New or extended gas lines
Usually does not
- Interior and exterior painting
- Swapping one floor for another
- New trim and baseboards
- Drywall patches and repairs
- A straight fixture-for-fixture swap, such as a light or a faucet
Rules vary by municipality and by the work. This page is general guidance, not legal advice.
Section 02
How we coordinate Red Seal trades and inspections.
01 Scoping
We flag permit needs before the quote is final.
At the site walk, we note anything likely to need a permit. The permit goes into the price and the schedule.
02 Red Seal trades
Certified tradespeople carry out the permitted work.
Red Seal electricians, plumbers, and gasfitters on our team do the permitted and ticketed work. Our crews do the carpentry, drywall, paint, and flooring around it.
03 Inspections
The rough-in passes inspection before drywall goes up.
On suites and similar work, the electrical and plumbing rough-in is inspected before we book drywall.
Section 03
Municipalities we work across.
Each of our 12 community pages covers the homes and common work there.
- Victoria
- Saanich
- Central Saanich
- North Saanich
- Oak Bay
- Esquimalt
- View Royal
- Langford
- Colwood
- Sidney
- Highlands
- Metchosin
Trades and projects
Projects
A project guide for permitted electrical work
Which home projects typically need a permit in Greater Victoria?
Structural wall changes, new suites, many raised or attached decks, panel upgrades, new circuits, plumbing rough-in, and gas lines often need one. Painting, flooring swaps, trim, and a straight fixture swap usually do not.
This is general guidance, not legal advice. We confirm the rules for your project with the municipality or Technical Safety BC.
Who carries out permitted electrical, plumbing, and gas work on your projects?
Red Seal electricians, plumbers, and gasfitters on our team.
We schedule their work with the carpentry, drywall, paint, and flooring.
Is the rough-in inspected before the drywall goes up?
Yes. On suites and similar work, the electrical and plumbing rough-in is inspected before drywall goes up.
Drywall, paint, and flooring follow after the inspection.
Do permit rules differ between municipalities on the Island?
Yes. A deck or suite that needs a permit in one community may have different rules in the next.
We check the rules for your address at the site walk.
One contract · One schedule · One accountable team
Not sure if your project needs a permit? Ask us.
Free estimate
Get permit needs flagged at the site walk.
Send a few details and we will set a time.

