Multi-trade renovations.
The eight projects we take on most, with the trades each one needs and the order they work in.
- General contractor
- Based in North Saanich
- Greater Victoria
Project scope P01
Kitchen and bathroom renovations
Layout changes, new wiring and plumbing, walls, and finishes for a kitchen or bathroom.
Good to know
Fixtures and trim go in last, once the floor is down.
Typical scope
- Wall and layout changes framed by our carpentry crew
- New circuits, lighting, and outlets for the kitchen or bath
- Sink, fixture, and drain rough-in, then fixtures set
- Moisture-resistant drywall in the bathroom, taped and painted
- New floors, then trim and baseboards fitted
Permits
New circuits, moved drains, and water heater changes often need a permit. A straight fixture swap usually does not.
Project scope P02
Secondary suites and basement conversions
Framing, wiring, plumbing, drywall, and finishes for a suite with its own kitchen and bath.
Good to know
The rough-in is inspected before the drywall goes up.
Typical scope
- Framing for suite walls, bedrooms, and a bathroom
- New circuits, lighting, and outlets for the suite
- Bathroom and kitchen plumbing rough-in
- Board, tape, and finish, with moisture-resistant board in wet rooms
- Paint, then water-resistant plank flooring and trim
Permits
Suite electrical and plumbing, such as new circuits and moved drains, often needs a permit. Fire separation and egress rules also shape the layout.
Project scope P03
Whole-home interior upgrades
Repairs, lighting, paint, new floors, and trim across several rooms.
Good to know
One booking covers what would otherwise be five separate jobs.
Typical scope
- Wall and ceiling patches blended into the existing finish
- Lighting and fixture upgrades room by room
- Fresh paint on walls, ceilings, trim, and doors
- Laminate, vinyl plank, or engineered wood laid flat
- Trim, casings, and baseboards fitted after the floor goes down
Trade sequence
- 01DrywallandElectrical
- 02Painting
- 03Flooring
- 04Carpentry
Permits
Paint, drywall patches, and new floors rarely need a permit. New circuits or a panel upgrade usually do.
Project scope P04
Decks, cedar fencing, and exterior refresh
Clearing, decks and stairs, cedar fences and gates, then exterior paint.
Good to know
All of it fits in the dry months, late spring to early fall.
Typical scope
- Blackberry, ivy, and overgrowth cleared from fence lines and the house
- Decks and outdoor stairs built for wet coastal winters
- Cedar fence runs and gates with posts set deep
- Rot repair on sills, fascia, and deck framing
- Exterior prep and paint booked for the dry months
Trade sequence
Permits
Many raised or attached decks need a permit. Rules vary by municipality.
Project scope P05
Basement finishing for family living space
A rec room, office, gym, or guest bedroom in an unfinished or dated basement. No suite kitchen.
Good to know
We check for moisture before any framing goes up.
Typical scope
- Foundation moisture, drainage, and subfloor checked before framing
- Wall framing for a rec room, office, gym, or guest bedroom
- Insulation, vapour barrier, and sound damping in walls and ceiling
- New circuits, lighting, and outlets for each room
- Plumbing rough-in for a lower-level bathroom or wet bar sink
- Drywall, paint, then water-resistant flooring and trim
Permits
Framing a basement, adding a bedroom, new circuits, and new plumbing often need a permit. This is general guidance, not legal advice.
Project scope P06
Accessibility and aging-in-place upgrades
Wider doorways, grab bar blocking, low-threshold showers, better lighting, and flush floors, planned room by room.
Good to know
We plan the room order so you can stay in the house.
Typical scope
- Interior doorways widened and reframed by our carpentry crew
- Solid wood blocking framed inside bathroom walls for grab bars
- Secure stair railings and low-slope exterior entry ramps
- Brighter low-glare hall and bath lighting, motion night lights, and easier-to-reach switches
- Walk-in or low-threshold showers, handheld showerheads, comfort-height toilets, and lever-handle faucets
- Clean wall patching, durable paint, and flush slip-resistant flooring with no trip lips
Permits
New circuits, moved switches or lighting, and plumbing changes such as a shower conversion often need a permit. These are practical home upgrades, not a code or accessibility certification. This is general guidance, not legal advice.
Project scope P07
Electrical panel, EV charger, and lighting upgrades
Panel upgrades, heat pump circuits, EV chargers, and pot lights, with the wall patching and paint done after.
Good to know
You are not left with holes in the walls after the electrician leaves.
Typical scope
- Electrical panel upgrades to make room for new load, such as a heat pump or EV charger
- Dedicated circuits for heat pumps, ranges, and other large appliances
- EV charger circuits run to the garage, carport, or driveway
- Pot lights and lighting upgrades, room by room
- Blocking, access panels, and trim repairs by our carpentry crew
- Drywall and plaster patches blended in, then painted to match
Trade sequence
Permits
Panel upgrades, new circuits, EV chargers, and heat pump circuits often need an electrical permit through the municipality or Technical Safety BC. Red Seal electricians on our team do all permitted electrical work. This is general guidance, not legal advice.
Project scope P08
Whole-home flooring, drywall, and interior painting
Drywall repairs, a full repaint, new floors through the house, then trim. No electrical work.
Good to know
Baseboards sit tight to the new floor, not the old one.
Typical scope
- Drywall and plaster cracks, dents, and holes patched and sanded
- Full interior repaint on walls, ceilings, doors, and trim
- Subfloor checked and levelled before the new floor goes down
- Laminate, vinyl plank, or engineered wood laid through the house
- Baseboards, casings, and floor transitions fitted after the floor is down
Permits
Drywall repairs, painting, new floors, and trim rarely need a permit on their own. This is general guidance, not legal advice.
Where we work
Twelve communities across the region.
From Sidney and North Saanich to Langford and Metchosin.
All service areasQuestions04 answers
What does a kitchen or bathroom renovation with Huysmans Contracting include?
Framing changes, electrical and plumbing rough-in, drywall, paint, flooring, and trim.
New circuits, moved drains, and water heater changes often need a permit. A straight fixture swap usually does not.
Can you build a secondary suite or finish a basement under one contract?
Yes. We frame, wire, plumb, drywall, paint, and floor suites and basements.
New circuits and moved drains usually need a permit, and Red Seal trades on our team do that work.
How do you run a full interior refresh across several rooms?
As one project, not several. A typical refresh covers wall and ceiling patches, lighting, paint, new floors, and baseboards.
Interior work goes ahead year-round.
How do you plan decks, fences, and exterior painting on the Island?
Around the dry months, late spring to early fall. We clear first and paint last.
Many raised or attached decks need a permit.
One contract ยท One schedule ยท One accountable team
Planning one of these projects?
Free estimate
Request an estimate.
Tell us about the project. We reply by phone or email.
- Phone
- 250-634-1262
- [email protected]
- Headquarters
- North Saanich, BCServing Greater Victoria and the Saanich Peninsula, Vancouver Island
What happens next
- 01We read your note
- 02We book a free site walk
- 03You get a written estimate before work starts